The Toronto multiplex guide

Rules, unit counts, conversion vs. new build, costs, timelines and financing. What to understand before you build a multiplex in Toronto.

Last updated:

What is a multiplex?

A multiplex is a house-scale residential building with two to six self-contained units on one lot. Each unit has its own kitchen, bathroom and entrance. Duplexes, triplexes, fourplexes and sixplexes are all multiplexes.

For homeowners, a multiplex can mean rental income, room for extended family, or a way to unlock the value of a large lot. For the city, it adds homes to neighbourhoods that already have transit, schools and services.

Why Toronto, and why now?

Several policy changes have lined up at the same time:

  • More units permitted. Fourplexes are allowed in residential neighbourhoods citywide, and sixplexes in selected wards.
  • Lower municipal fees. Development charges have been waived for many small multiplex projects.
  • Tax relief on new rentals. Qualifying new purpose-built rental projects may recover GST and Ontario’s portion of the HST.
  • Rental financing. Buildings with five or more rental units may qualify for CMHC MLI Select.

Each of these has eligibility rules. Treat them as reasons to investigate, not guarantees.

How many units can you build?

Maximum units by location (summary)TODO: verify
LocationUp toNotes
Residential neighbourhoods citywide4 unitsConversion or new build
Toronto and East York wards + Ward 236 unitsSixplex permissions
Most lots, in addition+ garden or laneway suiteLot conditions apply
Summary only. Your zoning, lot size and other constraints decide the real number.

See the sixplex ward map for an overview of where six units are permitted.

Rules to check before you design

  • Zoning: permitted building type, height, depth, setbacks and lot coverage
  • Building code: fire separation, sound control, exits, headroom
  • Heritage: listed or designated properties and heritage districts
  • Trees and ravines: protected trees and ravine-protected areas
  • Servicing: water, sewer, electrical capacity
  • Fire access: especially for garden and laneway suites

Conversion, addition or new build?

  • Conversion keeps the existing structure and divides it into units. Usually faster and cheaper per unit, if the house is in good shape.
  • Addition / extension adds a storey or footprint. Useful when the structure is sound but too small.
  • New build replaces the house. Best for poor structures or maximum unit counts.

Our services pages explain each approach in more detail.

Costs and timeline

Stages, typical time and cost (template)TODO: verify
StageTypical timeCost
Feasibility[x] weeks[$ placeholder]
Design & engineering[x] months[$ placeholder]
Permits[x] months[$ placeholder]
Construction[x] months[$ placeholder]
Contingency—[x]%
For reference only. Placeholders will be replaced with sourced figures.

Financing

  • Up to four units: typically financed as a residential property; ask your lender about rental income treatment.
  • Five or more units: commercial rental financing, including CMHC MLI Select, may be available.
  • Construction financing: draws are released as work is completed and inspected.

Read more in Financing a Toronto multiplex: CMHC MLI Select explained.

Monthly payment on a $1,000,000 mortgage
  • 25-year amortization
  • 30-year amortization

Calculated with Canadian fixed-rate convention (interest compounded semi-annually, paid monthly). Illustrative math only, not a rate quote.

Source: Calculation: standard Canadian mortgage payment formula

View data table
Interest rate 25-year amortization30-year amortization
3% $4,732$4,206
3.5% $4,993$4,476
4% $5,260$4,755
4.5% $5,535$5,042
5% $5,816$5,337
5.5% $6,104$5,639
6% $6,398$5,948
6.5% $6,698$6,264
7% $7,004$6,586

A worked example

Rental buildings are valued on their income. That makes the cap rate one of the most important numbers in any multiplex pro forma:

Value of $100,000 net operating income at different cap rates

Value = NOI ÷ cap rate. A small change in cap rate moves the valuation a lot. That is why lenders and appraisers look closely at it.

Source: Calculation: value = NOI ÷ cap rate

View data table
Cap rate Value
3.5% $2,857,143
4% $2,500,000
4.5% $2,222,222
5% $2,000,000
5.5% $1,818,182
6% $1,666,667
6.5% $1,538,462

Try your own numbers in the return calculator.

Example project numbers (illustrative template)TODO: verify
ItemAmount
Purchase price[placeholder]
Construction budget[placeholder]
Total project cost[placeholder]
Monthly rent (all units)[placeholder]
Annual operating costs[placeholder]
Net operating income (NOI)[placeholder]
Value at completion (NOI ÷ cap rate)[placeholder]
Cash out at refinance[placeholder]
Equity left in the project[placeholder]
For reference only. Not a forecast or an offer. Will be replaced with a real, documented project.

How we can help

Start with a free consultation. We will look at your address, explain what is likely possible, and tell you whether a full feasibility study is worth it.

Sources

Last updated:

Find out what your property can become

Tell us your address. We will check zoning, outline your options and give you an honest view on whether a multiplex makes sense. Free, with no obligation.